Case Study
Case Study: Steel Door Installation at a Police Station
Elite Entrance Systems recently completed the installation of two new steel entrance systems at a local police station. The project included a steel door-and-a-half set, providing a wider opening when required, together with a separate single steel door and glazed side-panel arrangement. Both installations were finished in blue to suit the existing building and included…
Read MoreCase Study: Automatic Swing Fire Door Automation
Elite Entrance Systems recently automated an internal swing fire door, improving accessibility while maintaining safe and controlled operation within the building. The project involved installing a DFA low-energy swing door operator with a slide arm, together with safety scanners and activation sensors to provide reliable automatic operation for building users. The new operator assists the…
Read MoreCase Study: Full Automated Gate System Upgrade
Elite Entrance Systems was appointed to complete a full upgrade of an existing automated gate system, replacing several of the main operating and safety components to improve the system’s performance, reliability and overall safety. The existing installation required more than an isolated repair. To provide a more complete and reliable solution, our engineers replaced the…
Read MoreGreenpeace – Accessible Entrance Installation
Elite Entrance Systems was appointed to install a new automated swing door entrance system for a Greenpeace facility, providing improved accessibility and reliable day-to-day operation for staff and visitors. Greenpeace is an internationally recognised environmental organisation, operating offices and facilities that support research, campaigning and environmental advocacy. The entrance installation was designed to provide safe,…
Read MoreQuadram Institute – Entrance Upgrade
As part of an entrance upgrade at the Quadram Institute, Elite Entrance Systems was appointed to replace an existing revolving door arrangement and install a new automated entrance solution to improve accessibility and pedestrian flow. The Quadram Institute is an internationally recognised research centre focused on food science, microbiology and human health. The entrance upgrade…
Read MoreNeonatal Unit Refurbishment – Folding Door Installation
As part of a refurbishment programme within a hospital Neonatal Unit, Elite Entrance Systems was appointed to upgrade existing folding door systems to support safe, reliable access in a sensitive clinical environment. The project involved the removal of five existing folding door sets and the supply, installation and commissioning of five new FTA20 bi-fold door…
Read More